Goyder South Wind Farm
78 turbines connected. Every joint terminated or personally witnessed by Caleb Vears.
Projects
Filter by battery, wind or solar. Open a project for the job as it was done.
Showing 6 projects.

78 turbines connected. Every joint terminated or personally witnessed by Caleb Vears.

Site safely isolated, service window completed, re-energised without incident.

Ongoing O+M partner for a live grid-scale BESS.

Handed over in 16 weeks: grid-connected, commissioned and operational.

16 cables repaired. Every joint IR and VLF tested. Asset back online by Caleb Vears.

1200 mm² collection network feeder terminations: Nexans termination kits, elbows and feeder exits at the collector substation.