Solar · 05

Kerta Road

Emergency HV cable repair response at the 5 MW solar farm after a civil excavator strike severed sixteen underground 300 mm² HV distribution cables mid-build. Earthed High Voltage mobilised, staged the cuts, performed sixteen Raychem heat-shrink straight joints and the full post-joint IR and VLF test regime, and returned the asset to service.

Cables in a trench running beside a solar array at sunset
Red and black high voltage cables laid beside containerised electrical equipment

Outcome

16 cables repaired. Every joint IR and VLF tested. Asset back online by Caleb Vears.

Enquiry

Tell us the voltage, the asset and the window.

We do the work most electricians can't.

CallRequest a quote