Solar · 05
Kerta Road
Emergency HV cable repair response at the 5 MW solar farm after a civil excavator strike severed sixteen underground 300 mm² HV distribution cables mid-build. Earthed High Voltage mobilised, staged the cuts, performed sixteen Raychem heat-shrink straight joints and the full post-joint IR and VLF test regime, and returned the asset to service.


Outcome
16 cables repaired. Every joint IR and VLF tested. Asset back online by Caleb Vears.
Services on this job
Capabilities
Enquiry
Tell us the voltage, the asset and the window.