Capability 05

Switching

HV operating authority, switching sheets, permits and in-house ePermit.

Transformer yard at a battery site, with the Earthed vehicle in the foreground
Technicians at an outdoor containerised high voltage switchboard

Scope

  1. 01

    HV operating authority

    Switching on renewable and network assets

  2. 02

    Switching sheets

    Written programs for isolation and restoration

  3. 03

    Permits

    Permit control around the service window

  4. 04

    In-house ePermit

    Permit issue inside the Earthed safety system

  5. 05

    Isolation

    Take plant offline, hold the window, restore it

  6. 06

    Emergency switching

    Short-notice programs after a fault

Enquiry

Tell us the voltage, the asset and the window.

We do the work most electricians can't.

CallRequest a quote