Capability 02
Wind
Collection network jointing, earthing and substation works across some of South Australia's largest wind farms.


Scope
- 01
MV/HV cable terminations
Collector feeders and turbine tails
- 02
Collection network jointing
XLPE straight joints across the array
- 03
Grid earth works
Turbine and substation earth grids
- 04
Substation
Collector substation HV works
- 05
Transmission earthing
Overhead line and structure earthing
- 06
Turbine commissioning
Pre-energisation testing and switching
Enquiry
Tell us the voltage, the asset and the window.
We do the work most electricians can't.